Old Molano
Hotel
McLarens Young International
VHS Consulted on the repair of this historic
building. The seaside hotel suffered extensive
damage due to a fire. The historic nature of the
building and the issues surrounding code
upgrades presented unique problems in
ascertaining how to reconstruct the
structure.
Foundry Square
McLarens Young
International
During the construction of an adjacent
building, the project included seismic upgrading
of an unreinforced brick masonry building.
During the seismic reinforcing a basement wall
collapsed. VHS consulted with the insurance
adjusters on issues concerning the rebuilding of
this wall and the extent to which the work
performed was already covered by the existing
contract as opposed to additional work caused by
the event.
Harvard Way Apartments
California
Capital Insurance Group
VHS investigated this burned out apartment
building and worked with the building department
to develop a scope of repair. Later VHS
estimated the costs and set up a contract for
the work to be performed.
Shelter Bay Condominiums
Rehabilitation, Mill Valley, California.
VHS provided construction drawings and
specifications for the $3.4 million repair of
extensive water and dry rot damage at this
deluxe 107 unit waterfront condominium
complex.
Bart / SFIA Extension San
Francisco, California.
Working for BATC (Bay Area Transit
Consultants, a group including Bechtel and
Parsons Brinkerhoff), VHS was charged with
providing an estimate intended to simulate a
contractor's bid of the "cut and cover"
tunnel.
Foothills Transportation
Corridor, Orange County, California.
VHS provided an independent estimate of
construction and engineering costs for proposed
design-build toll road project, including
conceptual design to a degree adequate to
determine what was to be built.
Granada Hills Medical
Center, Granada Hill, California.
VHS prepared construction cost estimates for
the reconstruction of a 6 story medical office
building that had collapsed in the 1994
Northridge (the greater Los Angeles area)
earthquake.
Drum Aferbay Reservoir,
PG&E Drum-Spaulding Project, Alta,
California.
As the result of winter storms, heavy
siltation collected in the reservoir. Insurance
adjusters needed an estimate of how much silt
had to be removed and the related costs of the
removal.
Penstock Reconstruction
Caribou Hydro-Electric Project, Belden,
California.
VHS monitored the planning, reconstruction
and repair of the penstocks. Landslides
destroyed one penstock and buried the adjacent
powerhouse. |